Craft is not a close-up of a hand. Professional construction makes four things visible: who performs the work, whether junctions are correct, how they are verified and what documentation remains.
ITALY SITE DELIVERYInternational team · on-site collaboration in Italy
Specialist trades of different nationalities work from shared drawings, details and inspection criteria. Experience guides the hand; standards make the result consistent.
MILANO / MULTILINGUAL COORDINATION
KORE / SITE UNIT 01
Hands. Standards. Evidence.
TEAM IN ACTIONLarge-format tiling / laser setting-out / flatness checksBRAND CAMPAIGN VISUAL
45.4642° N / 9.1900° E ITALY WORKSITE PROTOCOL
ITALIAN QUALITY BASELINE
Not merely appearing professional, but making every step verifiable.
These are not regulations reproduced for clients, but four evidence groups KORE uses to evaluate site quality. Each project remains subject to its design, site conditions, responsible parties and applicable rules.
IT-01 / REAL SITE
IT-01CEI 64-8 IX · DM 37/08
Accurate back boxes make aligned plates possible
Select 503 or 504 flush boxes to match drawings and plate modules. Multiple boxes on one wall share level, alignment and finished depth. The responsible installer tests the system and issues compliance documents.
503 / 504 matched to plate modules
Level, alignment and finished-depth control
Circuit tests + DiCo documentation
VERIFIABLE CRAFT
IT-02 / TECHNICAL VISUAL
IT-02UNI 11493-1:2025
Control the substrate before the tile finish
Verify substrate, materials and setting-out before checking adhesive coverage, joints, flatness, falls and movement joints. The quality of large-format tiling is largely hidden behind the tile.
Substrate and layout review
Adhesive coverage and joints
Straightedge / laser / falls
VERIFIABLE CRAFT
IT-03 / TECHNICAL VISUAL
IT-03UNI EN 14891:2017
Waterproofing is a continuous system, not a layer of colour
Walls, floors, corners, penetrations, joints and drainage points are treated continuously with compatible system materials. Junctions are photographed and checked before tiling.
Reinforced corners and penetrations
Traceable system materials
Concealed-work check before tiling
VERIFIABLE CRAFT
IT-04 / REAL SITE
IT-04REAL SITE · SURFACE CONTROL
A true substrate creates a clean finish
After preparation, straightedges and levels verify flatness, plumb and corners. Deviations are corrected before paint or tiling rather than concealed by the final layer.
Flatness checked with a long straightedge
Corners and plumb verified
Deviations corrected before finishes
VERIFIABLE CRAFT
THE HAND STILL MATTERS
Standards do not replace craft, they make good craft demonstrable.
Three direct actions show the priorities: flatness, alignment, full contact, continuity and the details that disappear beneath the finish.
REAL 01 / ELECTRICAL
Circuit organisation and wiring
A real record of distribution-board wiring. Circuits, protection, labelling and functional testing determine future maintainability.
REAL 02 / DRYWALL
Complex curves and lighting coordination
Curved openings, ceilings, lighting and MEP penetrations are coordinated together; board joints and edges are checked before closing.
REAL 03 / JOINERY
Bespoke joinery trial assembly
Components are preassembled and checked for connections and loads before finishing. Bespoke furniture follows the same verifiable delivery logic.
FULL SITE RECORD / 13 REAL FRAMES
Real site construction archive
Electrical, walls, drywall, painting, joinery and final installation are organised as an independent visual record following the actual sequence.
Not another construction sequence, but a clear statement of what each phase must confirm.
01 / BEFORE START
Pre-start review
Drawings, materials, service points and responsibilities are confirmed before site work begins.
02 / FIRST SAMPLE
First-sample approval
Setting-out, colour and special junctions are confirmed through a first standard sample.
03 / BEFORE CLOSING
Pre-close inspection
Waterproofing, services, frames and other concealed work are inspected and photographed.
04 / HANDOVER
Completion and handover
Final dimensions and functions are tested, defects resolved and required documents handed over.
Images marked REAL SITE come from KORE projects. The tiling and waterproofing images are technical visuals based on Italian details, explaining work hidden beneath finishes. The team hero is clearly identified as a campaign visual.