04 / CRAFT IN ITALY

CRAFTCRAFT IN ITALY

Craft is not a close-up of a hand. Professional construction makes four things visible: who performs the work, whether junctions are correct, how they are verified and what documentation remains.

ITALY SITE DELIVERYInternational team · on-site collaboration in Italy

Specialist trades of different nationalities work from shared drawings, details and inspection criteria. Experience guides the hand; standards make the result consistent.

MILANO / MULTILINGUAL COORDINATION
KORE site team laying and checking large-format tiles in a Milan interior — campaign visual
KORE / SITE UNIT 01

Hands.
Standards.
Evidence.

TEAM IN ACTIONLarge-format tiling / laser setting-out / flatness checksBRAND CAMPAIGN VISUAL

45.4642° N / 9.1900° E
ITALY WORKSITE PROTOCOL
ITALIAN QUALITY BASELINE

Not merely appearing professional,
but making every step verifiable.

These are not regulations reproduced for clients, but four evidence groups KORE uses to evaluate site quality. Each project remains subject to its design, site conditions, responsible parties and applicable rules.

Installer checking multi-gang electrical plates with a level on a real KORE site in ItalyIT-01 / REAL SITE
IT-01CEI 64-8 IX · DM 37/08

Accurate back boxes make aligned plates possible

Select 503 or 504 flush boxes to match drawings and plate modules. Multiple boxes on one wall share level, alignment and finished depth. The responsible installer tests the system and issues compliance documents.

  • 503 / 504 matched to plate modules
  • Level, alignment and finished-depth control
  • Circuit tests + DiCo documentation
VERIFIABLE CRAFT
Substrate inspection and double-buttering for large-format tiles on an Italian siteIT-02 / TECHNICAL VISUAL
IT-02UNI 11493-1:2025

Control the substrate before the tile finish

Verify substrate, materials and setting-out before checking adhesive coverage, joints, flatness, falls and movement joints. The quality of large-format tiling is largely hidden behind the tile.

  • Substrate and layout review
  • Adhesive coverage and joints
  • Straightedge / laser / falls
VERIFIABLE CRAFT
Continuous waterproofing at corners, service penetrations and drain flangeIT-03 / TECHNICAL VISUAL
IT-03UNI EN 14891:2017

Waterproofing is a continuous system, not a layer of colour

Walls, floors, corners, penetrations, joints and drainage points are treated continuously with compatible system materials. Junctions are photographed and checked before tiling.

  • Reinforced corners and penetrations
  • Traceable system materials
  • Concealed-work check before tiling
VERIFIABLE CRAFT
Installer checking wall substrate flatness with a long straightedge on a real KORE siteIT-04 / REAL SITE
IT-04REAL SITE · SURFACE CONTROL

A true substrate creates a clean finish

After preparation, straightedges and levels verify flatness, plumb and corners. Deviations are corrected before paint or tiling rather than concealed by the final layer.

  • Flatness checked with a long straightedge
  • Corners and plumb verified
  • Deviations corrected before finishes
VERIFIABLE CRAFT
THE HAND STILL MATTERS

Standards do not replace craft,
they make good craft demonstrable.

Three direct actions show the priorities: flatness, alignment, full contact, continuity and the details that disappear beneath the finish.

回路整理与接线真实工艺参考REAL 01 / ELECTRICAL

Circuit organisation and wiring

A real record of distribution-board wiring. Circuits, protection, labelling and functional testing determine future maintainability.

复杂曲面与灯位协调真实工艺参考REAL 02 / DRYWALL

Complex curves and lighting coordination

Curved openings, ceilings, lighting and MEP penetrations are coordinated together; board joints and edges are checked before closing.

定制家具试装真实工艺参考REAL 03 / JOINERY

Bespoke joinery trial assembly

Components are preassembled and checked for connections and loads before finishing. Bespoke furniture follows the same verifiable delivery logic.

KORE QUALITY GATES

Four quality gates

Not another construction sequence, but a clear statement of what each phase must confirm.

01 / BEFORE START

Pre-start review

Drawings, materials, service points and responsibilities are confirmed before site work begins.

02 / FIRST SAMPLE

First-sample approval

Setting-out, colour and special junctions are confirmed through a first standard sample.

03 / BEFORE CLOSING

Pre-close inspection

Waterproofing, services, frames and other concealed work are inspected and photographed.

04 / HANDOVER

Completion and handover

Final dimensions and functions are tested, defects resolved and required documents handed over.